• Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
  • Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
  • Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
  • Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
  • Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
  • Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507

Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507

Condition: New
Type: Quick Coupling
Color: Original Stainaless Steel
Product Name: Vapor Recovery Coupler
Material: Aluminum
Outer Diameter: 3"/4"
Samples:
US$ 13/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (26)

Basic Info.

Model NO.
GY-507
Certification
ISO9001:2008
Worker Temperature
-50~+150
Payment Terms
T/T, Western Union, Paypal
Working Pressure
0.6MPa
Transport Package
Normally Cartons by Sea or International Express
Specification
Normally cartons
Trademark
DESEINOR
Origin
Jiangsu, China
HS Code
8479899990
Production Capacity
1000000PCS/Year

Product Description


Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507
Aluminum Vapor Recovery Coupler for Tank Trucker Parts Gy-507

Product description 
Item name Vapor recovery Coupler
Item NO. GY-507
outer diameter 3"/4"
Certification ISO9001:2008
worker temperature  -50°C-+150°C
Working pressure 0.6Mpa
Material Aluminum

 
Vapor recovery Coupler
 

Installed on the tank near to discharging position, with quick coupler connection structure, as an important part of tank for controlling vapor input and output to realize vapor recovery function. There is pneumatic interlock valve to touch the interlock valve by valve abutment to control the combing vent valve Aluminum materials with oxidation treatment, high anti-corrosion, with stainless steel components, long service.
 
Packaging & Shipping
Trade Information FOB,CIF,LC,CFR, EXW,
Payment term T/T, L/C, D/A, D/P, western union
Delivery time 10-30 working days according to order quantity
Package   Normally cartons can be as customers requirement
Shipment By sea, by air and by express

 
Our Servise

1. Your inquiry related to our products or prices will be replied within 24hours.
2. Well-trained and experienced staffs to answer all your enquiries in fluent English.
3. Offering the support to solve the problem in the application or selling period.
4. Competitive prices based on same quality.
5. Guarantee samples quality same as mass production quality.
 
Our Promise
1. Welcome your 2D, 3D, and other drawings.
2. Not only manufacture mould, but aslo supply product.
3. IF you are interested in our products. please contact us at your any convenience .we'd like totell you more about our products.meantime,you only need to give us your requirements in detailfor your products.we can design and produce for you very well.
4. We warmly welcome your visit,as it is said to see is to believe if possible.

 
Company Description: 
We are professional manufacturer for fule tank accessories,chemical cart,gas station, oil depot accessories and other fule machine related accessories.
The products are mainly include:camplock coupling, API adaptor valve, vapor recovery valve, over fill prevention valve, manhole cover, fule nozzle, pressure vacuum valve,ball valve, etc. 
It's with accuracy module, independent D&R ability, CNC machine, high quality control system. 
We insist on"Innovation Decides Development" as company principal. The products are well received by demestic and overseas market. We will keep on enhancing the ability of independent research and develop to satisfy the customer's demand.





 
Contacts Echo wen
   
   
   
Facebook +8617751951594
Company Xuzhou Desheng Petrol Machine Co.,LTD
Product Vapor Coupler,Aluminum Vapor Recovery Elbows, 2.5",3", 4",Aluminum Vapor Recovery Elbows,Vapor Vent Coupler Manufacture, Vapor Recovery Coupling, Fuel Tanker Coupler,Vapor Recovery Coupler,Vapor Recovery Joint,Tank Trailer Equipment,Hose Coupler,Vapor Recovery Coupler, Vapor Recovery Coupling, Reducing Vapor Adaptor,Hose Coupler,Vapor Coupler, Oil Truck Spares, Vapor Recovery Parts,Vapor Coupler, Oil Truck Spares, Vapor Recovery Parts,Vapor Recover Coupler, Aluminum Vapor Recover Coupler, 3 Inch Vapor Recovery Coupler,Vapor Return Coupler, Coupler, Vapor Adaptor Valve Part,Vapor Coupler, Aluminum Vapor Recovery Elbows, 2.5" 3" 4"Aluminum Vapor Recovery Elbows,Vapor Recovery Elbows, Vapor Recovery Joint, Vapor Joint,Vapor Return Coupler, Hose Couplers, Fuel Tanker,Vapor Recovery Joint, Vapor Recovery Coupler, Aluminum Coupling,Vapor Return Hose Couplers, Aluminum Vapor Recovery Elbows, Vapor Coupler,Vapor Return Coupler Manufacture, Vapor Adaptor Valve Part, Vapor Vent Coupler,Coupler,Vapor Return Coupler, Vapor Return Coupling, Fuel Tanker Coupler,Vapor Return Coupler, Vapor Return Coupling, Fuel Tanker Coupler,Vapor Recovery Joint, Vapor Recovery Coupler,Vapor Return Coupler, Fuel Tanker, Tank Truck,Valve, Adaptor Valve, Aluminium Alloy Valve,Vapor Recovery Elbows Manufacture, Vapor Recovery Joint, Vapor Vent Coupler,Vent Joint, Oil Tanker Accessory, Coupler Cap,Camlock, Oil Truck Parts,Coupler,
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
97
Year of Establishment
2008-10-27